logo
آخرین مورد شرکت

Solutions Details

Created with Pixso. صفحه اصلی Created with Pixso. راه حل ها Created with Pixso.

Industrial Safety Storage Upgrade for Australian Manufacturing Facility

Industrial Safety Storage Upgrade for Australian Manufacturing Facility

2026-04-13

Industrial Safety Storage Upgrade for Australian Manufacturing Facility

H2: Project Background

An Australian industrial manufacturing enterprise initiated a storage system upgrade due to factory expansion and updated safety compliance requirements.

The project involved storage of:

  • Flammable liquids (bulk storage)
  • Aerosol containers (multi-capacity scenarios)

Key requirements included:

  • Compliance with EN 14470 and VDMA 24994 standards
  • Guaranteed delivery timeline
  • Complete documentation for customs clearance and safety acceptance

H2: Client Requirements and Scenario Analysis

The storage system needed to address:

  • 250L-level flammable liquid storage
  • Multi-scale aerosol storage (18 / 72 / 180 units)
  • Adaptation to high temperature and humidity conditions in Australia

Additionally, the client required a full compliance documentation package for internal approval and regulatory checks.


H2: Solution (Product and System Matching)

H3: Flammable Liquid Storage

  • Model: 65-DGC250
  • Capacity: 250L
  • Structure: Full-welded steel cabinet
  • Standard: EN 14470, GB/T 3836
  • Feature: Leakage containment + fire resistance

H3: Aerosol Storage System

  • Models: 64-AC001 / 002 / 003
  • Capacity: 18 / 72 / 180 cans
  • Structure: Corrosion-resistant metal
  • Standard (AC003): VDMA 24994

H3: Logistics and Delivery Plan

  • Shipping date: April 12
  • Arrival date: April 29
  • Mode: Sea freight (containerized)

H3: Compliance Documentation

  • Certification: CE, SGS
  • Technical documents: Datasheets, test reports
  • Trade documents: Invoice, packing list, certificate of origin

H2: Project Execution

H3: Production and Quality Control

All products were manufactured and inspected based on defined parameters, including material thickness, structural welding, and leakage control requirements.

H3: Delivery Performance

  • Shipment executed on schedule
  • No delay in port delivery timeline
  • Packaging compatible with container transport

H3: Technical Verification

  • Full-welded structure ensures leakage control (aligned with GB/T 3836 requirements)
  • Materials demonstrate corrosion resistance under acid/alkali exposure
  • Aerosol cages support stable storage in industrial environments

H2: Results and Client Feedback

The delivered system met the client’s operational and compliance requirements:

  • Equipment supports immediate deployment after arrival
  • Documentation enables direct use in customs clearance and safety audits
  • Storage configuration aligns with actual production scenarios

Client feedback indicates that:

  • Product specifications matched both Australian and international standards
  • Delivery timeline and documentation preparation supported project efficiency

H2: Summary

This project highlights a full-process delivery model combining:

  • Standard-compliant product configuration
  • Structured documentation support
  • Controlled logistics execution

Such an approach is applicable to industrial safety projects requiring multi-category equipment integration and regulatory compliance in cross-border scenarios.

آخرین مورد شرکت
Solutions Details
Created with Pixso. صفحه اصلی Created with Pixso. راه حل ها Created with Pixso.

Industrial Safety Storage Upgrade for Australian Manufacturing Facility

Industrial Safety Storage Upgrade for Australian Manufacturing Facility

Industrial Safety Storage Upgrade for Australian Manufacturing Facility

H2: Project Background

An Australian industrial manufacturing enterprise initiated a storage system upgrade due to factory expansion and updated safety compliance requirements.

The project involved storage of:

  • Flammable liquids (bulk storage)
  • Aerosol containers (multi-capacity scenarios)

Key requirements included:

  • Compliance with EN 14470 and VDMA 24994 standards
  • Guaranteed delivery timeline
  • Complete documentation for customs clearance and safety acceptance

H2: Client Requirements and Scenario Analysis

The storage system needed to address:

  • 250L-level flammable liquid storage
  • Multi-scale aerosol storage (18 / 72 / 180 units)
  • Adaptation to high temperature and humidity conditions in Australia

Additionally, the client required a full compliance documentation package for internal approval and regulatory checks.


H2: Solution (Product and System Matching)

H3: Flammable Liquid Storage

  • Model: 65-DGC250
  • Capacity: 250L
  • Structure: Full-welded steel cabinet
  • Standard: EN 14470, GB/T 3836
  • Feature: Leakage containment + fire resistance

H3: Aerosol Storage System

  • Models: 64-AC001 / 002 / 003
  • Capacity: 18 / 72 / 180 cans
  • Structure: Corrosion-resistant metal
  • Standard (AC003): VDMA 24994

H3: Logistics and Delivery Plan

  • Shipping date: April 12
  • Arrival date: April 29
  • Mode: Sea freight (containerized)

H3: Compliance Documentation

  • Certification: CE, SGS
  • Technical documents: Datasheets, test reports
  • Trade documents: Invoice, packing list, certificate of origin

H2: Project Execution

H3: Production and Quality Control

All products were manufactured and inspected based on defined parameters, including material thickness, structural welding, and leakage control requirements.

H3: Delivery Performance

  • Shipment executed on schedule
  • No delay in port delivery timeline
  • Packaging compatible with container transport

H3: Technical Verification

  • Full-welded structure ensures leakage control (aligned with GB/T 3836 requirements)
  • Materials demonstrate corrosion resistance under acid/alkali exposure
  • Aerosol cages support stable storage in industrial environments

H2: Results and Client Feedback

The delivered system met the client’s operational and compliance requirements:

  • Equipment supports immediate deployment after arrival
  • Documentation enables direct use in customs clearance and safety audits
  • Storage configuration aligns with actual production scenarios

Client feedback indicates that:

  • Product specifications matched both Australian and international standards
  • Delivery timeline and documentation preparation supported project efficiency

H2: Summary

This project highlights a full-process delivery model combining:

  • Standard-compliant product configuration
  • Structured documentation support
  • Controlled logistics execution

Such an approach is applicable to industrial safety projects requiring multi-category equipment integration and regulatory compliance in cross-border scenarios.